Unit Complex Repair
A Unit complex at Algester.
NBN had laid their new services to all residents in the complex.
450 meters of the trench had to be backfilled and surfaced with new Asph
.
Uneven Surfaces
Jeep wreckers in Hervey Bay.
This area was unlevel to the stage the forklift had difficulty driving over. Removal and increasing the base thickness and then replacing the Asphalt. All completed within half a day.
Joining to new Kerbing
Crestmead
Kerb and channel with drainage had been installed after the road had been constructed.
We saw cut the existing road to a uniform width then laid Asphalt to 40mm.
Road Repair
Housing development west of Maryborough.
The road had failed in various areas due to the developers not addressing the ground conditions thoroughly and not building the road to suit.
The road needed to be repaired before the council would allow any property sales to go ahead.
We removed all the damaged areas and laid cement-treated roadbase to 250mm then surfaced with Asphalt.
Driveway Repair
Previous contractors installed mismatched pipes and eventually started to fail with the above driveway starting to disappear where the pipe ends meet.
Complete removal and replacement of a new headwall and larger pipes than original.
Then the correct procedure with backfilling around pipes and finally resurfacing with Bitumen.